BAKER RD over WILLOW BAYOU
0.2 MI NW OF FM 2004 · County 167, Texas · Built 2005 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.314214, -95.095325
This bridge is in worse condition than 40.3% of bridges in County 167. The average bridge in Texas is 0 years old; this one is 21 years old.
Nearby Bridges
FM 2004 over WILLOW BAYOU
Built 1962
FM 646 over Willow Bayou
Built 2024
HIGHLAND RD. over CLOUD BAYOU
Built 1995
28TH ST over CLOUD BAYOU
Built 1988
28TH ST over DRAINAGE DITCH
Built 1997
FM 2004 over HALLS BAYOU
Built 1965
LEM BISHOP ROAD over OWENS BAYOU
Built 2002
HIGHLAND RD over DRAINAGE DITCH
Built 1990
SH 6 over DRAINAGE DITCH
Built 1931
SH 6 over DRAINAGE DITCH
Built 1931
Bridge Details
- Structure #
- 120850AA0701065
- Year Built
- 2005
- Length
- 24.4 m (80.1 ft)
- Max Span
- 24.1 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.