FM 270 over ROBINSON BAYOU

0.15 MI W OF FM 518 · County 167, Texas · Built 1981 · 7 Lanes · 30,155 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
120850331202003
Year Built
1981
Length
38.1 m (125 ft)
Max Span
12.8 m
Width
27.5 m (90.2 ft)
Lanes
7
Daily Traffic
30,155
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.