LAKE OLYMPIA EB over OYSTER CREEK

0.1 MI E OF SH 6 · County 157, Texas · Built 2009 · 2 Lanes · 1,030 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
120800R00663001
Year Built
2009
Length
79.2 m (259.8 ft)
Max Span
18.3 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
1,030
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.