STADIUM DR over OYSTER CREEK & UPRR

0.2 MI N OF US 90A · County 157, Texas · Built 2018 · 4 Lanes · 8,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
120800H02014020
Year Built
2018
Length
155.1 m (508.9 ft)
Max Span
37.2 m
Width
20.4 m (66.9 ft)
Lanes
4
Daily Traffic
8,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.