SWEETWATER BLVD EB over BULLHEAD SLOUGH
0.25 MI SW OF AUSTIN PKWY · County 157, Texas · Built 1986 · 2 Lanes · 8,490 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.575461, -95.619994
This bridge is in worse condition than 81.2% of bridges in County 157. The average bridge in Texas is 0 years old; this one is 40 years old.
Nearby Bridges
SWEETWATER BLVD WB over BULLHEAD SLOUGH
Built 1986
SWEETWATER BLVD NB over ALCORN BAYOU
Built 1986
SWEETWATER BLVD SB over ALCORN BAYOU
Built 1986
AUSTIN PKWY EB over DRAINAGE DITCH
Built 1984
AUSTIN PKWY WB over DRAINAGE DITCH
Built 1984
AUSTIN PKWY EB over DRAINAGE DITCH
Built 1985
AUSTIN PKWY WB over DRAINAGE DITCH
Built 1985
LEXINGTON BLVD over DRAINAGE DITCH
Built 1995
GREEN FIELDS DR over DRAINAGE DITCH
Built 1983
COMMONWEALTH EB over ALCORN BAYOU TRIBUTARY
Built 1998
Bridge Details
- Structure #
- 120800H00282001
- Year Built
- 1986
- Length
- 46.3 m (151.9 ft)
- Max Span
- 15.2 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 8,490
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,000
- Total Project Cost
- $9,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.