CHURCH ST over BUFFALO CREEK
0.20 MI N OF COLONY RD · County 157, Texas · Built 1988 · 2 Lanes · 380 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
29.388225, -95.831564
This bridge is in worse condition than 96.8% of bridges in County 157. The average bridge in Texas is 0 years old; this one is 38 years old.
Nearby Bridges
WEST ST over DRAINAGE DITCH
Built 1995
CHURCH ST over DRAINAGE DITCH
Built 2007
W FIRST ST over DRAINAGE DITCH
Built 1988
HUBENAK RD over BUFFALO CREEK
Built 1985
RICHMOND RD over FAIRCHILDS CREEK
Built 2019
SH 36 over Fairchilds Crk Trib 5
Built 2024
SH 36 NBML over Trib 4 to Fairchilds Crk
Built 2023
PADON RD over FAIRCHILDS CREEK
Built 2006
PADON RD over DEER CREEK
Built 1995
JESKE RD over FAIRCHILDS CREEK
Built 2015
Bridge Details
- Structure #
- 120800F00045002
- Year Built
- 1988
- Length
- 15.9 m (52.2 ft)
- Max Span
- 4 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 380
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $15,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.