W Aliana Trace Dr over Oyster Creek
0.85 Mi S of W Airport · County 157, Texas · Built 2018 · 2 Lanes · 200 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.638408, -95.702939
This bridge is in worse condition than 34.6% of bridges in County 157. The average bridge in Texas is 0 years old; this one is 8 years old.
Nearby Bridges
SH 99 NB over BULLHEAD SLOUGH
Built 2017
SH 99 over Oyster Creek
Built 1994
SH 99 SB over BULLHEAD SLOUGH
Built 2017
Kirkshaw Dr over Oyster Creek
Built 2020
Fairbairn Way over Trib Oyster Creek
Built 2018
Westmoor Dr over Drainage Ditch
Built 2018
SH 99 over Drainage Ditch
Built 1994
SH 99 SB over W Airport Blvd
Built 2013
SH 99 NB over W Airport Blvd
Built 2013
HARLEM ROAD NB over OYSTER CREEK
Built 2015
Bridge Details
- Structure #
- 120800AA9242232
- Year Built
- 2018
- Length
- 33.5 m (109.9 ft)
- Max Span
- 18.3 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.