Harvest Corner Dr over Oyster Creek
1.23 Mi SW of Harlem Rd · County 157, Texas · Built 2017 · 2 Lanes · 1,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.647647, -95.722842
This bridge is in worse condition than 34.6% of bridges in County 157. The average bridge in Texas is 0 years old; this one is 9 years old.
Nearby Bridges
WATERSIDE EST CIR over OYSTER CREEK TRIBUTARY
Built 2001
Harlem Rd over Oyster Creek Trib #3
Built 1994
Harvest Garden WB over Oyster Creek
Built 2015
Harvest Garden EB over Oyster Creek
Built 2015
SH 99 SB over W Airport Blvd
Built 2013
SH 99 over Oyster Creek Trib #3
Built 1994
SH 99 NB over W Airport Blvd
Built 2013
SH 99 SB over HARLEM ROAD
Built 2017
SH 99 NB over HARLEM ROAD
Built 2017
S Mason Rd over Drainage Ditch
Built 2010
Bridge Details
- Structure #
- 120800AA4278214
- Year Built
- 2017
- Length
- 85.3 m (279.9 ft)
- Max Span
- 21.3 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.