S FRY RD WB over BUFFALO BAYOU TRIBUTARY
1.20 MI E OF SH 99 · County 157, Texas · Built 1992 · 2 Lanes · 1,001 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.717778, -95.755003
This bridge is in worse condition than 96.8% of bridges in County 157. The average bridge in Texas is 0 years old; this one is 34 years old.
Nearby Bridges
S FRY RD EB over BUFFALO BAYOU TRIBUTARY
Built 1991
S FRY RD WB over BUFFALO BAYOU
Built 1992
S FRY RD over BUFFALO BAYOU TRIB
Built 1991
S FRY RD EB over BUFFALO BAYOU
Built 1991
MASON RD NB over BUFFALO BAYOU
Built 1988
MASON RD SB over BUFFALO BAYOU
Built 1988
EMILY PARK LANE over DRAINAGE DITCH
Built 2003
MASON RD SB over BUFFALO BAYOU TRIBUTARY
Built 1991
MASON RD NB over BUFFALO BAYOU TRIBUTARY
Built 1991
PEEK RD NB over BUFFALO BAYOU
Built 1991
Bridge Details
- Structure #
- 120800AA1117002
- Year Built
- 1992
- Length
- 67.1 m (220.1 ft)
- Max Span
- 13.4 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,001
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,000
- Total Project Cost
- $14,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.