5TH ST over STAFFORD RUN
1.65 MI SW OF FM 2234 · County 157, Texas · Built 1996 · 4 Lanes · 15,276 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.600061, -95.553586
This bridge is in worse condition than 34.6% of bridges in County 157. The average bridge in Texas is 0 years old; this one is 30 years old.
Nearby Bridges
5TH ST over BRAZOS RIVER AUTH CANAL
Built 2007
DEBORAH ST over BRAZOS RIVER AUTH CANAL
Built 1987
LEXINGTON BLVD EB over STAFFORD RUN
Built 2000
LEXINGTON BLVD WB over STAFFORD RUN
Built 2001
WILLOW DR over STAFFORD RUN
Built 1995
FM 1092(MURPHY RD) over AMERICAN WATER CANAL
Built 1984
COURT RD over BRAZOS RIVER AUTH CANAL
Built 2006
FM 1092(MURPHY RD) over STAFFORD RUN CREEK
Built 1984
US 90A EB over Stafford Rd
Built 2008
US 90A WB over Stafford Rd
Built 2008
Bridge Details
- Structure #
- 120800AA0645001
- Year Built
- 1996
- Reconstructed
- 2009
- Length
- 29.3 m (96.1 ft)
- Max Span
- 9.8 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 15,276
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,000
- Total Project Cost
- $11,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.