FM 2759 NB over MIDDLE BAYOU
0.3 MI SW OF US 59 · County 157, Texas · Built 1978 · 3 Lanes · 15,470 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.557894, -95.692081
This bridge is in worse condition than 34.6% of bridges in County 157. The average bridge in Texas is 0 years old; this one is 48 years old.
Nearby Bridges
IH 69 / US 59 NB over SH 99 & Drain
Built 2007
IH 69 / US 59 SB over SH 99 & Drain
Built 2007
SH 99 over DRAINAGE DITCH
Built 1994
GREATWOOD PKWY SB over MIDDLE BAYOU
Built 1991
GREATWOOD PKWY NB over MIDDLE BAYOU
Built 1991
KNOLL FOREST DR over RABBS BAYOU
Built 1991
FM 2759 over RABBS BAYOUS
Built 2020
TARA BLVD over RABBS BAYOU
Built 1984
BRAZOS TRACE DRIVE over RABBS BAYOU
Built 1999
TARA PLANTATION DR over DRAINAGE DITCH
Built 1985
Bridge Details
- Structure #
- 120800141503010
- Year Built
- 1978
- Length
- 41.1 m (134.8 ft)
- Max Span
- 13.7 m
- Width
- 13 m (42.7 ft)
- Lanes
- 3
- Daily Traffic
- 15,470
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.