IH 69 NB OFF-RMP over SP 41 & IH 69 NB ON RMP
2.0 MI NE of SH 6 · County 157, Texas · Built 2008 · 1 Lanes · 5,001 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
29.624411, -95.596819
This bridge is in worse condition than 81.2% of bridges in County 157. The average bridge in Texas is 0 years old; this one is 18 years old.
Nearby Bridges
US 90A EB over IH 69 / US 59 FR
Built 2007
US 90A WB over IH 69 / US 59 FR
Built 2007
IH 69 / US 59 over Storm Sewer Lateral
Built 1970
IH 69 / US 59 over US 90A & UP RR
Built 2002
IH 69 / US 59 ML over SP 41 (Sugar Creek Blvd)
Built 2004
IH69/US59 SB On-Rp over SP 41 & IH 69 SB Exit
Built 2008
INDUSTRIAL BLVD over SUGAR LAND CANAL
Built 1980
SCHLUMBERGER DR NB over SUGAR LAND CANAL
Built 1994
SCHLUMBERGER DR SB over SUGAR LAND CANAL
Built 1994
US 90A over DULLES/KIRKWOOD
Built 2008
Bridge Details
- Structure #
- 120800002712311
- Year Built
- 2008
- Length
- 603.8 m (1981 ft)
- Max Span
- 37.8 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 1
- Daily Traffic
- 5,001
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.