US 90A EB over PRISON FARM RD (RELIEF)
0.20 MI SW OF SH 6 · County 157, Texas · Built 1942 · 3 Lanes · 10,670 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.610553, -95.655319
This bridge is in worse condition than 34.6% of bridges in County 157. The average bridge in Texas is 0 years old; this one is 84 years old.
Nearby Bridges
US 90A WB over PRISON FARM RD (RELIEF)
Built 1925
EASTON AVE over BULLHEAD BAYOU
Built 2010
SH 6 over US 90A & UP RAILROAD
Built 2008
SH 6 SB OFF-RAMP C over SH 6 SB ON-RAMP
Built 2007
SH 6 NB ON-RAMP B over SH 6 NB OFF-RAMP
Built 2007
US 90A WB over BULLHEAD BAYOU
Built 1925
US 90A EB over BULLHEAD BAYOU
Built 1942
CAMBRIDGE SCHOOL over BULLHEAD BAYOU
Built 1999
US 90A over Drainage Ditch
Built 2007
UNIVERSITY BLVD SB over BULLHEAD BAYOU
Built 2011
Bridge Details
- Structure #
- 120800002708058
- Year Built
- 1942
- Reconstructed
- 2017
- Length
- 18.3 m (60 ft)
- Max Span
- 6.1 m
- Width
- 15.4 m (50.5 ft)
- Lanes
- 3
- Daily Traffic
- 10,670
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,000
- Total Project Cost
- $4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.