BISSELL RD over DRAINAGE DITCH
0.55 MI E OF MASTERS ST · County 039, Texas · Built 2015 · 2 Lanes · 1,500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.460867, -95.349039
This bridge is in worse condition than 28.3% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 11 years old.
Nearby Bridges
SH 6 over DRAINAGE DITCH
Built 1995
JORDAN RD over DRAINAGE DITCH
Built 2011
LEWIS LN over DRAINAGE DITCH
Built 2012
CR 190 over DRAINAGE DITCH
Built 2011
MERIDIANA PKWY over BNSF RR nBISSELL ROAD
Built 2021
FM 1128 over NEW BAYOU
Built 1984
CLARK RD over BRAZOS RIV AUTH CANAL
Built 1990
SH 6 over DRAINAGE DITCH
Built 1995
LOUISIANA ST over MUSTANG BAYOU
Built 2013
MASTERS ST over DRAINAGE DITCH
Built 2015
Bridge Details
- Structure #
- 120200W00118001
- Year Built
- 2015
- Length
- 15.2 m (49.9 ft)
- Max Span
- 15.2 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,500
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $21,000
- Total Project Cost
- $26,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.