CR 129 over COWART CREEK

1.60 MI NE OF SH 35 · County 039, Texas · Built 2004 · 2 Lanes · 5,890 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
120200AA0663001
Year Built
2004
Length
18.6 m (61 ft)
Max Span
18.3 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
5,890
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$117,000
Total Project Cost
$146,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.