HARKEY RD (CR103) over DRAINAGE DITCH
0.70 MI S OF BAILEY AVE · County 039, Texas · Built 1984 · 2 Lanes · 450 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
29.521561, -95.313864
This bridge is in worse condition than 90.9% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 42 years old.
Nearby Bridges
CR 100 over BRAZOS RIV AUTH CANAL
Built 2011
CR 101C (ALLEN RD) over BRAZOS RIV AUTH CANAL
Built 2011
CR 143 over DRAINAGE DITCH
Built 2001
WELLBORN over DRAINAGE DITCH
Built 1999
CR 103 over MARYS CREEK
Built 2008
FM 1128 over MARYS CREEK
Built 1984
CR 115 (WELLS DR) over COWART CREEK
Built 2011
CR 143 over DRAINAGE DITCH
Built 2011
ARNOLD RD over S FORK MARYS CREEK
Built 2011
OLD CHOC BYU RD over BRAZOS RIV AUTH CANAL
Built 2010
Bridge Details
- Structure #
- 120200AA0565002
- Year Built
- 1984
- Length
- 7.9 m (25.9 ft)
- Max Span
- 4 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 450
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $15,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.