CR 190 over Drainage Ditch

0.01 MI E OF cr 383 · County 039, Texas · Built 2023 · 2 Lanes · 1,179 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
120200AA0505112
Year Built
2023
Length
15.2 m (49.9 ft)
Max Span
15.2 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
1,179
Material
Prestressed Concrete
Design
Other
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.