FM 2403 over SOUTH DRAINAGE DITCH

3.8 MI SOUTH SH 35 · County 039, Texas · Built 2024 · 2 Lanes · 7,480 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
120200295001003
Year Built
2024
Length
52.5 m (172.2 ft)
Max Span
21.3 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
7,480
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.