FM 1462 over BRAZOS RIVER

JCT AT FORT BEND C/L · County 039, Texas · Built 1965 · 2 Lanes · 5,641 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

29.352728, -95.519328

This bridge is in worse condition than 90.9% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 61 years old.

Nearby Bridges

Bridge Details

Structure #
120200141404015
Year Built
1965
Reconstructed
1995
Length
252.4 m (828.1 ft)
Max Span
54.9 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
5,641
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,171,000
Total Project Cost
$1,464,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.