SH288 NBFR to TLNB over SH 288 NB AND H SLOUGH

0.5 MI N OF FM 518 · County 039, Texas · Built 2024 · 1 Lanes · 6,614 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
120200059802471
Year Built
2024
Length
438.6 m (1439 ft)
Max Span
37.2 m
Width
8 m (26.2 ft)
Lanes
1
Daily Traffic
6,614
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.