SH 288 SB over W FORK CHOCOLATE BAYOU
2.54 MI S OF SH 6 · County 039, Texas · Built 1980 · 2 Lanes · 22,747 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.452978, -95.423661
This bridge is in worse condition than 69.8% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 46 years old.
Nearby Bridges
SH 288 NB over W FORK CHOCOLATE BAYOU
Built 1982
CR 48 over W FORK CHOC BYU
Built 1975
SH 288 SB Exit Ram over Channel BDD5 101-05-00
Built 2017
SH 288 NB over OUTFALL CHANNEL
Built 1982
SH 288 SB over OUTFALL CHANNEL
Built 1982
Meridiana Pkwy WB over Detention Basin
Built 2017
Meridiana Pkwy EB over Detention Basin
Built 2017
CR 81 over W FORK CHOCOLATE BAYOU
Built 2011
Iowa Colony Bld SB over Detention Basin
Built 2018
Iowa Colony Bld NB over Detention Basin
Built 2018
Bridge Details
- Structure #
- 120200059802043
- Year Built
- 1980
- Length
- 37.3 m (122.4 ft)
- Max Span
- 12.4 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 2
- Daily Traffic
- 22,747
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.