SH 35 WB over SAN BERNARD RIVER

2.35 MI SW OF SH 36 · County 039, Texas · Built 1958 · 2 Lanes · 7,922 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
120200017902052
Year Built
1958
Reconstructed
2008
Length
316.7 m (1039 ft)
Max Span
42.7 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
7,922
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$578,000
Total Project Cost
$723,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.