SH 35 over CHOCOLATE BAYOU
0.50 MI SW OF FM 2917 · County 039, Texas · Built 1937 · 2 Lanes · 12,487 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.335836, -95.284553
This bridge is in worse condition than 69.8% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 89 years old.
Nearby Bridges
SH 35 over DRAINAGE DITCH
Built 1937
CR 192 over DRAINAGE DITCH
Built 2010
FM 2917 over DRAINAGE DITCH
Built 1959
CR 172 over CHOCOLATE BAYOU
Built 2011
CR 191 over DRAINAGE DITCH
Built 2011
CR 172 over DRAINAGE DITCH
Built 2011
CR 197 over DRAINAGE DITCH
Built 1971
CR 171 over CHOCOLATE BAYOU
Built 1980
CR 169 over NEW BAYOU
Built 1984
SH 35 over DRAINAGE DITCH
Built 1998
Bridge Details
- Structure #
- 120200017803023
- Year Built
- 1937
- Reconstructed
- 1998
- Length
- 73.6 m (241.5 ft)
- Max Span
- 10.5 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 12,487
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $134,000
- Total Project Cost
- $168,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.