SH 94 over CANEY CREEK RELIEF

3.70 MI N OF US 287 · County 455, Texas · Built 1955 · 2 Lanes · 2,334 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
112280031902050
Year Built
1955
Length
36.9 m (121.1 ft)
Max Span
9.2 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
2,334
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$67,000
Total Project Cost
$84,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.