SH 19 SB over TRINITY RIVER RELIEF

0.75 MI N OF WALKER C/L · County 455, Texas · Built 2002 · 2 Lanes · 4,772 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
112280010908050
Year Built
2002
Length
292.6 m (960 ft)
Max Span
36.6 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
4,772
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.