CR 2545 over TUCKER BRANCH

1.2 MI NW OF FM 139 · County 419, Texas · Built 1960 · 2 Lanes · 109 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
112100AA0320002
Year Built
1960
Length
7 m (23 ft)
Max Span
3 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
109
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.