CR 4789 over LAKE TIMPSON TRIBUTARY
1.8 MI NE OF END FM 2667 · County 419, Texas · Built 1999 · 1 Lanes · 55 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.851217, -94.412678
This bridge is in worse condition than 59.3% of bridges in County 419. The average bridge in Texas is 0 years old; this one is 27 years old.
Nearby Bridges
CR 4789 over TRIB OF BLACKWATER CREEK
Built 2004
CR 4789 over Trib to Blackwater Creek
Built 2018
E LAKE TIMPSON RD over BLACKWATER CREEK
Built 1967
CR 4098 over BLACKWATER CREEK
Built 2018
CR 4778 over HARDAGE CREEK
Built 1996
CR 4778 over HARDAGE CREEK RELIEF
Built 1996
US 59 over HARDAGE CREEK
Built 1936
CR 4020 over BELLMYER BRANCH
Built 2021
SH 87 over DRAW
Built 1955
US 59 over ATTOYAC RIVER
Built 1936
Bridge Details
- Structure #
- 112100AA0222001
- Year Built
- 1999
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.8 m
- Width
- 4.8 m (15.7 ft)
- Lanes
- 1
- Daily Traffic
- 55
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.