FM 3081 over PEACH CREEK

7.25 MI S OF FM 1725 · County 407, Texas · Built 1986 · 2 Lanes · 1,615 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
112040259402005
Year Built
1986
Length
36.9 m (121.1 ft)
Max Span
9.1 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
1,615
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.