FM 2213 over CARRIZO CREEK

2.10 MI S OF SH 21 · County 405, Texas · Built 1956 · 2 Lanes · 1,020 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
112030168002003
Year Built
1956
Length
22.9 m (75.1 ft)
Max Span
7.6 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
1,020
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.