Davidson Road over Wilson Branch
0.5 Mi E of SH 87 · County 403, Texas · Built 2018 · 2 Lanes · 50 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
31.409278, -93.825872
This bridge is in worse condition than 33.3% of bridges in County 403. The average bridge in Texas is 0 years old; this one is 8 years old.
Nearby Bridges
SH 87 over BOREGAS CREEK
Built 1964
DORSEY RD over BOREGAS CREEK
Built 1999
SH 21 over WILSON BRANCH
Built 1966
SH 87 over PALO GAUCHO BAYOU
Built 1964
SH 87 over CAUSEY CREEK
Built 1964
SH 21 over BOREGAS CREEK
Built 1966
FM 3121 over PALO GAUCHO BAYOU
Built 1968
DORSEY RD over PALO GAUCHO BAYOU
Built 1999
192 over WET LAND
Built 2006
FM 2784 over PALO GAUCHO BAYOU
Built 1963
Bridge Details
- Structure #
- 112020AA0239001
- Year Built
- 2018
- Length
- 9.8 m (32.2 ft)
- Max Span
- 3 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.