SH 103 over TEBO CREEK

1.00 MI W OF FM 1592 · County 403, Texas · Built 1958 · 2 Lanes · 2,512 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
112020033608031
Year Built
1958
Reconstructed
1997
Length
10.1 m (33.1 ft)
Max Span
3 m
Width
24.8 m (81.4 ft)
Lanes
2
Daily Traffic
2,512
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.