US 96 over EASLEY CREEK

0.35 MI S OF FM 83 · County 403, Texas · Built 2006 · 3 Lanes · 2,676 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
112020006406051
Year Built
2006
Length
30.5 m (100.1 ft)
Max Span
30.5 m
Width
21.3 m (69.9 ft)
Lanes
3
Daily Traffic
2,676
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.