US 59 BUS NB over SPRR & COX ST
0.3 MI S OF SH 21 · County 347, Texas · Built 1938 · 2 Lanes · 13,839 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
31.601742, -94.657117
This bridge is in worse condition than 74.6% of bridges in County 347. The average bridge in Texas is 0 years old; this one is 88 years old.
Nearby Bridges
BU 59 over BANITA CREEK
Built 1940
SOUTH PECAN ST over BONITA CREEK
Built 1941
SOUTH FREDONIA ST over BONITA CREEK
Built 1973
WEST PILLAR ST over BONITA CREEK
Built 1950
US 59 BUS SB over SPRR & COX ST
Built 1967
S CHURCH ST over BONITA CREEK
Built 1985
SH 21 over BANITA CREEK
Built 1957
BU 59 over RUSK BRANCH
Built 1939
SH 21 over LA NANA CREEK
Built 1941
FM 1638 over BANITA CREEK
Built 1956
Bridge Details
- Structure #
- 111740017601141
- Year Built
- 1938
- Length
- 299.9 m (983.9 ft)
- Max Span
- 20.7 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 13,839
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $55,000
- Total Project Cost
- $69,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.