SH 21 over CARRIZO CREEK
3.5 MI SE OF LOOP 224 · County 347, Texas · Built 2024 · 2 Lanes · 4,625 vehicles/day
Overall
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
31.572661, -94.567853
This bridge is in worse condition than 19.9% of bridges in County 347. The average bridge in Texas is 0 years old; this one is 2 years old.
Nearby Bridges
CR 302 over CARRIZO BAYOU
Built 1994
CR 307 over TRIB OF CARRIZO BAYOU
Built 2005
SH 7 over CARRIZO CR RELIEF
Built 1935
SH 7 over CARRIZO CREEK
Built 1935
CR 229 over WHITE OAK BRANCH
Built 1996
LP 224 over SH 21
Built 1964
CR 230 over CARRIZO BAYOU
Built 1994
CR 220 over WHITE OAK BRANCH
Built 1993
FM 226 over ATASCOSO CREEK
Built 1987
CR 302 over MARTIN CREEK
Built 1984
Bridge Details
- Structure #
- 111740011808088
- Year Built
- 2024
- Length
- 85.3 m (279.9 ft)
- Max Span
- 21.3 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,625
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.