LP 304 over UPRR & TOWN BRANCH

0.45 MI SW OF US 287 · County 225, Texas · Built 1963 · 2 Lanes · 4,905 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
111140185401002
Year Built
1963
Length
81.4 m (267.1 ft)
Max Span
16.8 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
4,905
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.