FM 228 over SILVER CREEK SOUTH TRIB

0.8 MI NE OF FM 2022 · County 225, Texas · Built 2004 · 2 Lanes · 557 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
111140063503016
Year Built
2004
Length
13.7 m (44.9 ft)
Max Span
13.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
557
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.