SH 7 over TRINITY RIVER RELIEF

4.0 MI W OF FM 132 · County 225, Texas · Built 1957 · 2 Lanes · 2,084 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
111140033502020
Year Built
1957
Length
185 m (607 ft)
Max Span
9.1 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
2,084
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$337,000
Total Project Cost
$421,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.