KIRTLEY RD over RED BAYOU
0.1 MI SW of SH 7 · County 005, Texas · Built 1948 · 2 Lanes · 10 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
31.428778, -94.903533
This bridge is in worse condition than 91.9% of bridges in County 005. The average bridge in Texas is 0 years old; this one is 78 years old.
Nearby Bridges
SH 7 over RED BAYOU
Built 1961
SH 7 over JORDAN BRANCH
Built 1961
Old Homer Alto Hwy over Boden Creek
Built 2017
SH 103 over BODAN CREEK
Built 1942
CHEESELAND RD over RED BAYOU
Built 2001
US 69 over MULBERRY BRANCH
Built 1924
SH 7 over US 69
Built 1971
SH 7 over WATSON BRANCH
Built 1961
SH 103 over ROWAN CREEK
Built 1941
OLD BONNER RD over ROWAN CREEK
Built 1998
Bridge Details
- Structure #
- 110030AA0117001
- Year Built
- 1948
- Length
- 15.2 m (49.9 ft)
- Max Span
- 7.3 m
- Width
- 6.5 m (21.3 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.