FM 2497 over Cedar Creek

3.8 MI NW OF US 59 · County 005, Texas · Built 2022 · 2 Lanes · 1,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
110030258901005
Year Built
2022
Length
181.4 m (595.1 ft)
Max Span
25.9 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
1,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.