US 69 NB EXIT over SANDY CREEK

20.90 MI SE of LP 287 · County 005, Texas · Built 2022 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
110030020002314
Year Built
2022
Length
97.5 m (319.9 ft)
Max Span
33.5 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.