Toll 49 over Davis Branch
1.3 mi N of FM 849 · County 423, Texas · Built 2018 · 2 Lanes · 2,860 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.504047, -95.438289
This bridge is in worse condition than 41.4% of bridges in County 423. The average bridge in Texas is 0 years old; this one is 8 years old.
Nearby Bridges
Toll 49 over Davis Branch Tributary
Built 2018
Toll 49 over FM 16
Built 2018
FM 16 over HUBBARD CREEK
Built 1990
FM 849 over Toll 49
Built 2018
FM 16 over Hubbard Branch
Built 1948
CR 411 over PRAIRIE CREEK TRIB
Built 2024
US 69 over PRAIRIE CREEK
Built 1947
Toll 49 NB On-Ramp over Long Brake Tributary
Built 2018
TOLL 49 SB Ramp over IH 20
Built 2013
Toll 49 NB Ramp over IH 20
Built 2018
Bridge Details
- Structure #
- 102120TL0049066
- Year Built
- 2018
- Length
- 105.2 m (345.1 ft)
- Max Span
- 35.1 m
- Width
- 14.2 m (46.6 ft)
- Lanes
- 2
- Daily Traffic
- 2,860
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.