CR 285 over Prairie Cr

2.2mi S of SH 64 · County 423, Texas · Built 2022 · 2 Lanes · 1,723 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
102120AA0285201
Year Built
2022
Length
25.9 m (85 ft)
Max Span
25.9 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,723
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.