US 69 over BOWDOIN BRANCH
4.3 MI NW OF FM 1804 · County 423, Texas · Built 2009 · 5 Lanes · 10,585 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.5824, -95.455442
This bridge is in worse condition than 41.4% of bridges in County 423. The average bridge in Texas is 0 years old; this one is 17 years old.
Nearby Bridges
US 69 NB over DUCK CREEK
Built 2009
US 69 SB over Duck Creek
Built 1955
CR 452 over DUCK CREEK
Built 2015
US 69 over Winding Branch
Built 2009
CR 452 over MACS CREEK
Built 1995
CR 431 (Old SH 37) over DUCK CREEK
Built 1921
US 69 NB over SABINE RIVER
Built 2009
US 69 SB over SABINE RIVER
Built 1955
Toll 49 over CR 431/Stevenson Branch
Built 2018
CR 4118 over Toll 49
Built 2018
Bridge Details
- Structure #
- 102120019004012
- Year Built
- 2009
- Length
- 10.1 m (33.1 ft)
- Max Span
- 3 m
- Lanes
- 5
- Daily Traffic
- 10,585
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $179,000
- Total Project Cost
- $379,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.