US 271 NB over HARRIS CREEK TRIB

0.2 MI W OF FM 2908 · County 423, Texas · Built 1969 · 2 Lanes · 6,660 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
102120016501032
Year Built
1969
Length
36.9 m (121.1 ft)
Max Span
9.1 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
6,660
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.