CR 2210 over CHEROKEE BU BR

3.4 MI NW OF SH 149 · County 401, Texas · Built 1992 · 1 Lanes · 38 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
102010AA2210102
Year Built
1992
Reconstructed
2001
Length
15.2 m (49.9 ft)
Max Span
7.9 m
Width
4.7 m (15.4 ft)
Lanes
1
Daily Traffic
38
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$38,000
Total Project Cost
$48,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.