FM 782 over DRY CREEK
5.3 MI N OF US 259 · County 401, Texas · Built 2000 · 2 Lanes · 291 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
32.2427, -94.751425
This bridge is in worse condition than 54.4% of bridges in County 401. The average bridge in Texas is 0 years old; this one is 26 years old.
Nearby Bridges
CR 254 over TXU MINING HAUL RD
Built 2002
FM 782 over BOGGY BRANCH
Built 2000
CR 254 over MILL CR
Built 2003
CR 254 over TXU MINING HAUL RD
Built 2002
SH 322 over Mining Haul Rd (TXU)
Built 2002
SH 322 over DOGWOOD CREEK
Built 1972
FM 1716 over TXU MINING HAUL ROAD
Built 2008
SH 322 over BEAVER RUN BAYOU
Built 1959
SH 43 over DRY CREEK
Built 1936
FM 782 over TUMCO MINING HAUL RD
Built 1991
Bridge Details
- Structure #
- 102010111601006
- Year Built
- 2000
- Length
- 13.7 m (44.9 ft)
- Max Span
- 3 m
- Width
- 35.9 m (117.8 ft)
- Lanes
- 2
- Daily Traffic
- 291
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $56,000
- Total Project Cost
- $70,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.