US 259 SB over CANEY CREEK

0.8 MI S OF FM 850 · County 401, Texas · Built 1936 · 2 Lanes · 5,662 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
102010013803035
Year Built
1936
Length
34.7 m (113.8 ft)
Max Span
8.8 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
5,662
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$90,000
Total Project Cost
$113,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.