US 259 over Bighead Cr

2.70 MI S OF GREGG CL · County 401, Texas · Built 1923 · 4 Lanes · 12,702 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
102010013802013
Year Built
1923
Reconstructed
1969
Length
12.2 m (40 ft)
Max Span
6.1 m
Width
35.8 m (117.5 ft)
Lanes
4
Daily Traffic
12,702
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$74,000
Total Project Cost
$137,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.