FM 85 over TRINITY RIVER RELIEF

0.40 MI NE OF NAVARRO C/L · County 213, Texas · Built 1958 · 2 Lanes · 2,942 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

32.316406, -96.359536

This bridge is in worse condition than 89.8% of bridges in County 213. The average bridge in Texas is 0 years old; this one is 68 years old.

Nearby Bridges

Bridge Details

Structure #
101080071904006
Year Built
1958
Length
323.7 m (1062 ft)
Max Span
9.1 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
2,942
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$55,000
Total Project Cost
$69,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.