HOLLYBROOK DR over OAKLAND CR

0.6 MI E OF JUDSON RD · County 183, Texas · Built 1988 · 4 Lanes · 12,504 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
100930E00480001
Year Built
1988
Reconstructed
1998
Length
16.1 m (52.8 ft)
Max Span
2.4 m
Width
19.2 m (63 ft)
Lanes
4
Daily Traffic
12,504
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$134,000
Total Project Cost
$206,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.